Case Studies
The Bluecoat School
Project Duration: 2 weeks The Chapel Block at The Bluecoat School in Edgbaston had recently had its 29year old Hoval boiler condemned and the block was without heating. Midland HVAC undertook the project at short notice with a complete turn around in 2 weeks. The old...
Ashby Fields Primary School
Project Duration: 6 weeks Ashby Fields Primary School, Daventry, during the school summer holiday period Midland HVAC undertook replacing 25 water heaters to new unvented Zip Aquapoint water heaters, replacing 30 fan convectors to new SPC fan convectors and 28 LST...
Parmiters School
Project Duration: 4 months Parmiters School, Watford had 1 main boiler room with 8 boilers, which heated 3 blocks in the school as a district heating configuration with pipework running in underground ducts around the school. 5 of the 8 boilers had failed beyond...